Built across substations, solar, and transmission
Every project here ran from first-issue drawings to energization sign-off under one contract. MW capacity, voltage class, and timeline are on record — not summarized.






Three sectors. Documented scope.
132 kV Grid Substation
50 MW Solar Generation Plant
220 kV Double-Circuit Line
85 km of 220 kV double-circuit overhead line: tower design, foundation, stringing, and protection relay commissioning. Full handover at 14 months.
Full EPC delivery: civil, structural, primary equipment, and protection systems. 132 kV, 2×40 MVA. Energized on schedule at 18 months.
Design, procurement, and construction of 50 MW DC ground-mount array with 33 kV collector substation. Grid-connected and commissioned in 22 months.
Numbers from completed projects
600 MW
220 kV
400 km
24+
EPC projects completed across all sectors.
Total generation and substation capacity delivered.
Highest voltage class designed and constructed.
Overhead transmission line built and energized.
Ready to scope your project?
Bring us your voltage class, site constraints, and timeline. We will tell you exactly what full-cycle delivery looks like for your project.