Wide overhead aerial view of a large substation under active construction, steel lattice structures being erected, crews coordinating on the ground below, midday industrial daylight, expansive site footprint visible
Wide overhead aerial view of a large substation under active construction, steel lattice structures being erected, crews coordinating on the ground below, midday industrial daylight, expansive site footprint visible
— Delivery Record

Built across substations, solar, and transmission

Every project here ran from first-issue drawings to energization sign-off under one contract. MW capacity, voltage class, and timeline are on record — not summarized.

Ground-level view of a high-voltage substation nearing completion, transformer banks installed, cable trays running between steel structures, workers in hard hats visible mid-frame, flat overcast daylight
Ground-level view of a high-voltage substation nearing completion, transformer banks installed, cable trays running between steel structures, workers in hard hats visible mid-frame, flat overcast daylight
Wide environmental shot of a utility-scale solar field, rows of photovoltaic panels stretching to the horizon, overhead power lines visible in background, harsh midday sun casting short shadows, desert terrain
Wide environmental shot of a utility-scale solar field, rows of photovoltaic panels stretching to the horizon, overhead power lines visible in background, harsh midday sun casting short shadows, desert terrain
Close-up of high-voltage transmission towers being erected by crane in open terrain, steel lattice arms extended, linemen working aloft, clear sky, wide site visible in background
Close-up of high-voltage transmission towers being erected by crane in open terrain, steel lattice arms extended, linemen working aloft, clear sky, wide site visible in background
/ Completed Works

Three sectors. Documented scope.

Substation EPC
Solar EPC
Transmission Line

132 kV Grid Substation

50 MW Solar Generation Plant

220 kV Double-Circuit Line

85 km of 220 kV double-circuit overhead line: tower design, foundation, stringing, and protection relay commissioning. Full handover at 14 months.

Full EPC delivery: civil, structural, primary equipment, and protection systems. 132 kV, 2×40 MVA. Energized on schedule at 18 months.

Design, procurement, and construction of 50 MW DC ground-mount array with 33 kV collector substation. Grid-connected and commissioned in 22 months.

+ Scope on Record

Numbers from completed projects

600 MW

220 kV

400 km

24+

EPC projects completed across all sectors.

Total generation and substation capacity delivered.

Highest voltage class designed and constructed.

Overhead transmission line built and energized.

Ready to scope your project?

Bring us your voltage class, site constraints, and timeline. We will tell you exactly what full-cycle delivery looks like for your project.